The Electrical Power Supply System

The golden rule: An uninterrupted power supply

  • Electrical connection with three monitored differential current
       10 KV underground cables, redundancy n+2
  • AC USV with bridging time of more than 15 Minutes (notably
       above the lead time of the emergency backup generator)
  • Concept with diesel generators, three feeds with 3200 A
       circuit-breakers respectively
  • Separate A/B/C bus bar system supplying critical and
       non-critical equipment
  • Separate power distribution units with respective A and B
       customer allocation, as well as C allocation
  • The power for the infrastructure components in the InterNetX Tier 3 Data Center is supplied 100% through hydropower. This is assessed and certified by TÜV-Süd (CMS Standard Generation EE+).