The golden rule: An uninterrupted power supply
- Electrical connection with three monitored differential current
10 KV underground cables, redundancy n+2 - AC USV with bridging time of more than 15 Minutes (notably
above the lead time of the emergency backup generator) - Concept with diesel generators, three feeds with 3200 A
circuit-breakers respectively - Separate A/B/C bus bar system supplying critical and
non-critical equipment - Separate power distribution units with respective A and B
customer allocation, as well as C allocation
- 100 % energy from hydropower - The power for the
InterNetX Tier 3 Data Center is supplied 100%
by hydropower. This is assessed and certified by
TÜV-Süd (CMS Standard Generation EE+).